Standard Wastewater Service Rates
Effective July 1, 2026
Wastewater usage is billed per thousand gallons and, unless a wastewater meter has been installed, is based on water meter readings. Residential and Commercial wastewater service are billed through a contract with Chester Metropolitan District. Industrial wastewater services is billed directly through CWR.
Monthly Base Charge
Meter Size
3/4″
1″
1.5″
2″
3″
4″
6″
8″
10″
Base Charge
$27.82
$32.80
$45.13
$60.00
$94.67
$144.19
$267.94
$416.45
$589.78
Monthly Volumetric Charge
Residential/Commercial
Industrial
| Industrial Tier 1– up to 5,000,000 gallons |
| Industrial Tier 2– 5,000,001-10,000,000 gallons |
| Industrial Tier 3– 10,000,001-15,000,000 gallons |
| Industrial Tier 4– > 15,000,000 gallons |
$13.35/1,000 gallons
$15.21/1,000 gallons
$13.71/1,000 gallons
$12.19/1.000 gallons
$11.42/1,000 gallons
Monthly High-Strength Surcharge Rates
Discharge
Biochemical Oxygen Demand
Total Suspended Solids
Ammonia (above 25 ppm)
Surcharge (per pound above 250 ppm)
$0.71
$0.94
$4.67
Tap Fees
Tap Fee
$3,567.56 (minimum)
Additional Fees
Industrial Permitting Fee
Septic Dumping Fee
Flat Rate-Single
Flat Rate – Double
Flat Rate -Triple
$195.28
$583.97/month
$64.80
$129.60
$194.40
Capital Recovery Fees
Meter Size
3/4″
1″
1.5″
2″
>2″
Capacity Ratio
1.00
1.67
3.33
5.33
n/a
RC/SR Basin
$1,790
$2,980
$5,950
$9,520
$7.14/gpd
$
LR Basin
$4,000
$6,680
$13,320
$21,320
$16.00/gpd
Development Rate Schedule
Effective April 18, 2023
PROJECT INITIATION/SKETCH PLAN REVIEW FEE:
- $500.00
CONSTRUCTION PLAN REVIEW FEES:
- Subdivision up to 30 Lots $500.00
- Subdivision > 30 Lots $500.00 plus $20/lot over 30
- Non-Residential Developments $300.00 plus $75/acre over 1 acre
- Linear Projects (Off-Site Sewer) $500.00 plus $0.40 per linear foot
- Lift Stations $500.00 per Lift Station
- Sewer As-Built Review $750.00
- Additional Review >2 Reviews 40% of original review fee per occurrence
- FULL TIME INSPECTOR FEE: (if unapproved contractor is used for system installation)
- CWR Inspector $65 per hour on site
IF AN OUTSIDE CONSULTANT/SERVICE PROVIDER IS REQUIRED, CWR WILL INVOICE AT COST.
ALL FEES SUBJECT TO CHANGE WITH APPROPRIATE NOTICE